CASE STUDIES / TRAINING
Integrated Waste Management Services
EnviroCom’s substantial experience in the industrial sector, coupled with knowledge of best practice waste systems and organisational cultural change, has been utilised by Stanwell Corporation, primarily at Stanwell Power Station (SPS) west of Rockhampton, since 2008. Coinciding with the introduction of an integrated waste management plan for the site, EnviroCom has provided on the ground services to ensure effective and compliant management of waste via waste audits, waste systems advice, contractor liaison and delivery of environmental training. This has been supported through reviews of waste management policies and procedures, including the handling and tracking of regulated and hazardous wastes.
Since 2010 EnviroCom has also provided on the ground waste advice during station outage (shutdown) events, assisting SPS to effectively manage increased waste volumes and an expanded workforce over this period.